Send Message
Henan Dongfang Noodle Machine Group Co., Ltd. 86-138-38362606 eastgroup.sales@gmail.com
Fully Automatic Stick Noodles Production Line Plant ISO9001 CE

Fully Automatic Stick Noodles Production Line Plant ISO9001 CE

  • High Light

    Stick Noodles Production Line Plant

    ,

    ISO9001 Stick Noodles Production Line

    ,

    Stick Noodle Plant ISO9001 CE

  • Name
    HNT-765
  • Machinery Capacity
    36ton/24h
  • Number Of Workers Required
    4 People(not Including Packaging Machine)
  • Condition
    New
  • Usage
    Full-automatic,Food Processing Industry
  • Place of Origin
    Henan, China
  • Brand Name
    Dongfang
  • Certification
    ISO9001, CE
  • Model Number
    HNT-765
  • Minimum Order Quantity
    1 SET
  • Price
    Negotiable
  • Packaging Details
    Simple packaging; wooden box packaging
  • Delivery Time
    60-120days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    200 sets per year

Fully Automatic Stick Noodles Production Line Plant ISO9001 CE

Stick Noodle Machinery Manufacturing Process Fully Automatic Stick Noodle Plant

 

Our company was founded in 1975, which is the largest noodle machine manufacturer in China. It is a company with technology researching, manufacturing and marketing. All the noodle equipment have passed ISO9001 and CE Certification.

 

Main Technical Parameters:

 

Product Name Dry Stick Noodles Production Line
Production Capacity 36T/24h
Roller Size 1000mm
Total Power 110KW
Equipment Area 90*11*5m
Material 304Stainless Steel

 

Electrical Control System:

 

Adopt international first-line brand, safe and reliable;

The whole line realizes automatic control, with sensitive feedback and control

precision;

Through Ethernet communication interface and Internet cloud technology

Retrieve data for remote control and fault analysis.

 

FAQ:

 

What are the raw materials used on the machine?

Our production line mainly uses food-grade SUS304, SUS316, POM and silicone parts that meet hygienic standards, as well as international brand electrical components. We can also make any custom design for you according to your needs.

 

When can I get an engineer from you?

When you have finished preparing the conditions (water, electricity, gas supply, production materials), contact our sales staff. We will send engineers to install your machine and train your staff to use it. Usually, when you are ready, you can contact our sales staff and cooperate with us to process the visa for the engineer, the engineer will arrive within 15 days.

 

How will my machine be installed when it arrives? how much does it cost?

We will send an engineer to your facility to assess the situation, install the machine and train your staff how to operate it. Clients pay for round-trip airfare, accommodation and salary/day/person.

 

Fully Automatic Stick Noodles Production Line Plant ISO9001 CE 0