Send Message
Henan Dongfang Noodle Machine Group Co., Ltd. 86-138-38362606 eastgroup.sales@gmail.com
Commercial Wheat Flour Chowmein Production Line Machine Dongfang

Commercial Wheat Flour Chowmein Production Line Machine Dongfang

  • High Light

    Wheat Flour Chowmein Production Line

    ,

    Dongfang chowmein production machine

    ,

    Dongfang Chowmein Production Line

  • Product Name
    Chowmein Noodle Production Line
  • Output Capacity
    6.5tons/8h
  • Raw Material
    Wheat Flour
  • Roller Size
    630mm
  • Drying Time
    30min
  • Function
    Noodle Making
  • Place of Origin
    Henan, China
  • Brand Name
    Dongfang
  • Certification
    ISO9001, CE
  • Model Number
    630
  • Minimum Order Quantity
    1 SET
  • Price
    Negotiable
  • Packaging Details
    Simple packaging; wooden box packaging
  • Delivery Time
    60-120days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    200 sets per year

Commercial Wheat Flour Chowmein Production Line Machine Dongfang

6.5tons8H Chowmein Production Line Handmade Noodle Making Machine Commercial

 

Henan Dongfang Noodle Machine Group Co., Ltd. was founded in 1975. The standardized factory building area beyond 150,000 square meters. With over 200 high-precision processing equipment such as the machining center, CNC machining tools, and laser cutting machines, Dongfang has become a world-serving noodle machine manufacturing enterprise.

 

Technical Parameters:

 

Product Name

Chowmein Noodle Production Line

Output Capacity

6.5tons/8h

Raw Material

Wheat Flour

Roller Size

630mm

Drying Time

30min

Function

Noodle Making

 

Product Features:

 

1. The shape of the noodle cake is various, which can be made into round, square, oval and other shapes.

2. The products are bright in color, smooth in taste, resistant to boiling and not easy to paste.

 

Preparations Before Production Line Installation:

 

According to the requirements of the equipment layout process drawing, the workshop floor shall be filled with cement concrete, and the sewer pipes and electric wire pipes shall be pre-buried at the same time. The ground should be flat, and there should be no obvious unevenness. Generally, it should be a terrazzo floor. Draw an ink line parallel to the wall from the beginning to the end of the equipment center line at the position where the equipment is to be installed, as the installation reference. In order to facilitate maintenance, the outline of the equipment should be no less than 1m away from the wall.

 

Commercial Wheat Flour Chowmein Production Line Machine Dongfang 0